Wan Yu's energy-saving lamps decorate the new night view of Beijing Railway Station


The new glazed tile is quaint and dignified, and a bright outline light illuminates the train station under the night. Yesterday, the Beijing Railway Olympics environmental improvement project with an investment of 335 million yuan was completed. After the grooming and Beijing Railway Station and Beijing West Railway Station, the Chinese and foreign guests will be welcomed with a new look.

The yellow glazed tile is an important feature of the Beijing Railway Station. From March 29th, after 75 days of intense construction, the new glazed tile from Mentougou completely replaced the old glazed tile that has been through 10 years of wind and rain. According to reports, this glazed tile specially made in Mentougou is used in the Forbidden City and the Temple of Heaven. Compared with the glazed tile used in the past, it has high quality and good color. The engineering staff said that the replacement of the glazed tile was not changed according to the original design of the Beijing Railway Station, and the replacement area reached 4,900 square meters.

Night lighting is also the main content of environmental remediation. It is understood that the neon lighting of the reconstructed Beijing station is not only 30% higher than the brightness of the past, but also more energy efficient. The staff said: The three-night scene lighting of Beijing Station is bigger than in the past, and the night will be brighter. The outline night illumination of the overall architectural shape of the Beijing Railway Station is composed of 11,850 energy-saving warm light bulbs. The two clock towers that make the Beijingers feel more intimate. Thanks to the LED light source, the clock numbers are clearer and brighter than before.

According to Chen Jianghe, deputy director of the Beijing Railway Bureau, the Beijing Railway Olympics environmental remediation project involves a total of seven major tasks, namely, the rectification of key stations, the installation of protective nets along the five-ring line, the rectification of the line appearance, the rectification of the residual wall, and the old community. Remediation, building decoration and cleaning. After 80 days and 65 days of construction, Beijing Railway Station and Beijing West Railway Station completed the entire project in recent days.

It is reported that no matter the difficulty of renovation, the time of rectification, or the quality of construction and the degree of night lighting, it has set the history of the two major stations. Among them, the facade of Beijing Station was cleaned by 21,245 square meters, the glazed tile and granite were oversized by 8092 square meters, and the whitewashed decoration was 18,095 square meters. The façade of Beijing West Railway Station was cleaned 153,621 square meters, with a thickness of 45,381 square meters, and the night lighting fixtures were also replaced.



1

Wireless Bluetooth headphone , stereo bluetooth Headphone 
Main features 

1.Vibration reminding when phone call comes in.

2.rubbish finish with Detachable cable

3.Delivers enhanced audio and bass response and a host of calling features in a sleek, comfortable design. 
4.Unique,  provides all day comfort and ease of use. 
5.High quality Bluetooth Headset with music & phone functions. 

6. Gift box packing per pc 

Wireless bluetooth headphones

Wireless Bluetooth Headphones

Wireless Bluetooth Headphones,Wireless Headphones,Wireless Earphones,Wireless Bluetooth Earbuds

Shenzhen Greater Industry Co., Ltd. , http://www.szgreater.net