1. Before installing the elevator, you must wear overalls and wear a safety helmet. Strictly check whether the tools, rigging and mechanical equipment are in good condition and reliable, and whether the safety net is safe and reliable.
2. The power equipment on site must be grounded firmly and insulated.
Mobile luminaires must use a safe voltage below 36V.
3. When the elevator installation needs manual transportation, it should be based on the weight and volume of the workpiece. Severely prevent accidents such as twisting, rubbing hands and lameness.
4, no hoisting machinery or hoisting inconvenience, when multiple people need to move, the division of labor is clear, reasonable weight, consistent pace, there is a special person command, unified action. The levers and springboard ropes used must be in good condition. 5. When handling parts, they must be moved from top to bottom and layer by layer. It is forbidden to extract from the bottom to prevent collapse and injury.
6. If you find that the items placed in the base are in danger of being shaken and scattered during transportation, they must be sorted out immediately, and they must not be paid to prevent collapse and injury.
7. The width of the springboard used shall not be less than 0.4 meters, the thickness shall not be less than 0.07 meters, the length shall not be less than 4 meters, and the ends shall be wrapped with iron hoops. When the length of the springboard exceeds 5 meters, the middle should be padded to avoid jitter. Thoroughly inspect before using the springboard. If cracks or other breaks are found, stop using them.
8. The crowbar used for handling the workpiece must be made of low-carbon steel. It is not allowed to be made of cast iron and hardened steel to prevent brittleness and injury. The pole and tie rods are made of tough wood. The surface must be planed and crack-free. The roller should be made of seamless steel pipe. The surface should be smooth and free of cracks. When using the roller to transport the object, the size should be selected according to the weight of the object.
9. Clamping rods and tripods are made of solid wood or seamless steel tubes. Cracks and decays are not allowed. When steel pipes and tripods need to be lengthened, the joints must be firm and reliable.
10. When loading and unloading and transporting goods by using paving panels and inclined panels, the width and type should be determined according to the goods, weight and type, and must be installed firmly.
11. When transporting objects, if the road surface is soft or the surface is uneven, wooden boards or squares must be laid.
12, the installation site and work-related personnel are prohibited from entering.
13. When using special lifting equipment during elevator installation and transportation, the safe operation rules of these special equipment must be observed.
14. Tools used on site should be kept in a safe place and must not be lost or damaged without cause.
15. On-site construction inspectors must carefully inspect each process and find that the areas that do not meet the quality standards are reflected in time, and the quality problems are eliminated before the inspection.
16. On-site construction found problems in civil engineering, wells, machine rooms, scaffolding, etc. Does not meet the requirements of the agreement between the two parties. It is necessary to discuss with Party A and clarify the responsibility.
17. Each team leader, quality inspector, safety officer and all team members should unite and assist each other, play their respective functions, and complete all tasks in the on-site construction.
18. In the on-site construction, it is necessary to maintain the credibility of the center, and it is not allowed to ask the user for special requirements for the money. If there is a disciplinary team, in addition to recovering the Soka materials, there is another penalty.
19. The above provisions shall be implemented on the same day, and those who violate the rules shall be punished.