Electrician safety management seven classics

First, "three defenses and ten essentials" Anti-accident measures 1 "three defenses": that is, to prevent electric shock damage, prevent high altitude fall damage, prevent falling (broken) rod damage.
2 "Ten must":
(1) Before the work, it is necessary to survey the construction site, and to investigate the site before the dangerous point analysis and pre-control work in advance. The person in charge of the work must clearly understand and clarify the work tasks, scope of work and construction methods, and according to the type, method, personnel and tools of the work. The environmental and other pre-control measures for dangerous points shall not be blindly accepted.
(2) Work tickets shall be used for maintenance and construction, and work tickets shall be filled in at the site before the operation for safe cross-over construction, and no work shall be conducted without a ticket. Before starting work, the person in charge of the work should pay the bottom of the work to the operator, so that the “four clear”, that is, the task is clear, the dangerous points on the site are clear, the operating procedures on the site are clear, and the safety measures to be taken are clear. You must not start work without paying the bill at the scene.

(3) The construction site shall be guarded by special personnel, and the site safety personnel, work licensors, and work class members shall be strictly responsible for the on-site safety. The full-time guardian shall provide the staff with mental state, equipment and equipment, on-site safety measures, The safety of the work shall be supervised and inspected throughout the whole process, and shall not be removed from work or replaced at will.

(4) Electrical operation shall first be blacked out. After the power is cut off, the grounding line shall be installed. The power failure shall be in accordance with the procedures of power failure, power inspection and grounding. For the dual power supply facilities, take measures to prevent reverse power transmission. The working part must be inspected, and the grounding wire should be installed immediately after the power is checked. It is forbidden to do no safety measures or change the order of operations at will.

(5) Wear safety helmets for high-altitude operations. When the foot buckles are put on the pole, the safety belts must be worn at the work site. Do not enter without permission. If you climb the work, check the tools and confirm the qualification. The whole process is fastened, the seat belt is fastened, and the safety protection must not be lost.

(6) If the ladder is ascended, it must be guarded by a special person. It is necessary to adopt anti-skid and high-limit measures. Before climbing, the ladder should be inspected and confirmed to be qualified, the base surface is firm, and the positioning is reliable. When working, the ladder should be inclined at an angle of about 60° to the ground. The top of the ladder shall not be less than 1 meter, and it shall be supported by a dedicated person throughout the whole process.

(7) If the artificial poles are to be used, the poles must be unified and commanded by the special personnel. The towers must be unified and commanded by qualified personnel to use qualified tools. Manual poles should use poles, and should not be replaced by iron shovel, piles, etc.; the lifting position of mechanical poles should be appropriate, and overload use is strictly prohibited.

(8) If the rod is to be withdrawn, the rod root must be inspected first. The temporary pull line or the sling rope pull line must be added. Check whether the shaft, the rod base, the pull line, etc. are firm, and make a temporary pull or sling. Feel free to adjust or remove. It is strictly forbidden to take the method of cutting the wire, ground wire or pulling wire suddenly.

(9) The construction of traffic main roads shall be set up with warning signs in two directions, and special personnel shall be set up to guard the detachment lines to be commanded by special personnel. In the roads, railways, waterways and other traffic main roads, signs shall be set up for warning and isolation, and special persons shall be hand-held to guard the flags. It is forbidden to take preventive measures against accidents caused by hanging wires.

(10) Putting or unplugging lines adjacent to or crossing the live line should use the insulated traction rope to be placed adjacent to or across the live line. When installing and removing the line, install a temporary grounding line on the nearby line. Use insulated traction rope and keep enough with the live line. safe distance.

Second, safety production "three to six check"
It is necessary to learn the lessons of the accident, check the ideological understanding, and investigate the responsibility;
It is necessary to study the regulations, check the implementation of regulations, and check compliance with the rules;
It is necessary to strengthen safety management, check hidden dangers, and check the implementation of plans.

Third, treat the accident "four will not let go"
1 The cause of the accident is unknown;
2 The person responsible for the accident and the educated person are not educated;
3 did not take precautionary measures and did not let go;
4 The person responsible for the accident has not been dealt with.

Fourth, to ensure safety, we must achieve "three hundred percent"
1% of the personnel, all staff are safe;
2% of the time, every time, every moment to ensure safety;
3 100% of strength, concentration, and concentration to ensure safety.

V. "Two votes and three systems"
Two votes: work ticket, operation ticket three systems: handover system, patrol inspection system, equipment periodic test and rotation system

Sixth, "three irons" against "three violations"
Three irons: iron discipline, iron treatment, iron face anti-three violations: anti-violation command, anti-violation operation, anti-violation of labor discipline

Seventh, five, and one check, the implementation of the leadership safety responsibility system;
Second, check the quality of key positions and key personnel;
Third, check the management of safety equipment;
Fourth, check the implementation of on-site operations;
Five checks on the implementation of the "two votes";
Implementing the "Three Preventions and Ten Important" Anti-accident Measures for Agricultural Power Maintenance and Construction Sites

plug

Plug,Plug Power Stock,Plug Power Yahoo,Power Plug Stock

WENZHOU TENGCAI ELECTRIC CO.,LTD , https://www.tengcaielectric.com